Key Projects

Our flagship projects showcasing exceptional scale, complexity, and impact in the construction industry.

Key Project

Cheras Bomba Quarters

Residential Completed

Completion of remaining works for 226 medium-cost apartments for the Fire & Rescue Department (Bomba) quarters at Lot 53681, Jalan Tenteram, Cheras, Kuala Lumpur.

RM 53,849,038
18 months
Started: 2 May, 2017
Kementerian Perumahan dan Kerajaan Tempatan (KPKT), Presint 4, Putrajaya
Jalan Tenteram, Cheras, Kuala Lumpur
Key Project

FIbre Optic work for Telekom Malaysia

Electrical Completed

The work involved providing fibre optic cabling and network development services for Telekom Malaysia Berhad (TM), requiring the deployment of three certified fibre optic teams.

RM 6,000,000
2 years
Started: December 1, 2009
Telekom Malaysia Berhad (TM)
Jalan Pantai Jaya, Off Jalan Pantai Baharu, 59200 Kuala Lumpur
Key Project

11kV Cable Relocation Works

Electrical Completed

SISJ is involed in the relocation of 11kV cable from the existing location to a new location. Includes the installation of new switchgears, transformers, and feeder pillars. SISJ is also involved in the undertaking of routine of preventative maintenance works for the 11kV and 33kV cable.

RM 585,000
2 years
Started: December 1, 2009
Conlay Construction Sdn Bhd

Other Projects

Additional projects demonstrating our diverse capabilities and commitment to quality construction.

Contractor Services - Bumiputera

Construction Completed

Appointment as contractor for Bumiputera development works with renewable contract terms

RM 1,500,000
12 months, renewable every year
Tenaga Nasional Berhad Menara Alliance NU Central Brickfield
Started: January 1, 2017

Infrastructure Development - Serantau

Construction Completed

Construction of infrastructure development for Serantau Upper Kerayong Di Zon 1- Taman Maluri C Dan Zon 3-Taman Lembah Maju, Selangor

RM 432,750
Standard period
Jabatan Perkhidmatan Pembentungan Kementerian Tenaga Teknologi Hijau Dan Air
Started: January 2, 2017

Waste Management Facility

Construction Completed

Design and construction of integrated waste management facility with recycling capabilities

RM 2,800,000
14 months
Environmental Protection Agency

Electrical Substation

Electrical Completed

Construction of high-voltage electrical substation with advanced monitoring systems

RM 3,200,000
16 months
Tenaga Nasional Berhad

Road Construction Project

Construction Completed

Major highway construction project connecting multiple districts with modern road infrastructure

RM 6,500,000
20 months
Jabatan Kerja Raya Malaysia

Water Treatment Plant

Construction Completed

Construction of advanced water treatment facility with filtration and purification systems

RM 4,100,000
15 months
Jabatan Bekalan Air

Telecommunications Tower

Telecom Completed

Installation and construction of telecommunications infrastructure and support facilities

RM 1,800,000
8 months
Telekom Malaysia

Industrial Warehouse

Industrial Completed

Construction of large-scale industrial warehouse with modern logistics facilities

RM 7,200,000
18 months
Industrial Development Corporation

Solar Power Installation

Renewable Energy Completed

Installation of solar power systems for commercial and residential buildings

RM 2,300,000
10 months
Green Energy Solutions

Hospital Renovation

Healthcare Completed

Comprehensive renovation and modernization of hospital facilities and infrastructure

RM 9,500,000
22 months
Ministry of Health

Routine & Preventive Maintenance for 11KV

Electrical Completed

Routine and preventive maintenance services for 11KV electrical systems

RM 1,200,000
TNB
Kuala Lumpur

Construction of 3 Storey Building, Fire Services Muar

Construction Completed

Construction of three-storey building for fire services in Muar

RM 9,757,296.62
KPKT
Johor

Installation & Commissioning of Fiber Optics Cables

Telecom Completed

Installation and commissioning of fiber optic cable systems

RM 6,000,000
TELECOM MALAYSIA
Selangor

Line Termination and Optic Fibre Works at MEC Substation

Electrical Completed

Line termination and optic fibre works at MEC substation in Gambang, Kuantan

RM 250,000
PARAGON
Kuantan

Mixed Development Project - Damansara

Construction Completed

Mixed development project in mukim damansara, daerah petaling, Selangor for Selat Makmur S/B

RM 496,000
KENBOJA MEGAH
Selangor

Guthrie Corridor Expressway Transmission Line Relocation

Infrastructure Completed

Transmission line relocation works (33kV, 132kV, 275kV) at multiple chainages

RM 2,840,000
GUTHRIE
Kuala Lumpur

SESB Distribution Network Project - RMK-8

Electrical Completed

33kV overhead line landing for PPU Ranca-Ranca F.T. Labuan

RM 71,000
AMALINSYA S/B
Sabah

KWSP-YTL Joint Venture Project Sungai Besi

Construction Completed

Joint venture construction project with KWSP and YTL S/B in Sungai Besi, Kuala Lumpur

RM 42,000
YTL S/B
Kuala Lumpur

TNB Silibin 132kV GIS Sub-station Erection

Electrical Completed

Erection work at TNB Silibin 132 kV GIS Sub-station

RM 29,800
W.E ENGINEERING S/B
Perak

Taman Hopeful 33kV Transmission Line Relocation

Electrical Completed

Relocation of existing 33kV transmission line and towers for earthwork commencement

RM 300,000
RH LETRIK S/B
Selangor

M308-KL Putrajaya Highway Package 6

Infrastructure Completed

Relocation of 33kV overhead transmission lines for highway project

RM 1,850,000
LEIGHTON CONTRACTORS S/B
Putrajaya

275kV Skudai - Gelang Patah Transmission Line

Electrical Completed

275kV transmission line landing into Gelang Patah substation

RM 404,200
TRENERGY INFRASTRUCTURE S/B
Johor

Shah Alam West Substation 275kV AIS & 132kV GIS

Electrical Completed

Supply, erect and commissioning of 275kV AIS, 132kV GIS switchgear and ancillary equipment

RM 1,274,000
KEMBOJA MEGAH S/B
Selangor

Flood Retention Pond - 33kV Line Relocation

Infrastructure Completed

Design, build and complete flood retention pond with 33kV line relocation

RM 392,780
TNL ENGINEERING S/B
Selangor

DUKE Section 1 - Jalan Duta Interchange

Infrastructure Completed

Increasing vertical clearance between HT cables (132 & 275kV) and finished road level

RM 803,500
WW ENGINEERING S/B
Kuala Lumpur

USJ Height TNB Pylons Relocation

Electrical Completed

Relocation of TNB Pylons at USJ Height development project

RM 1,030,000
EMASKANG S/B
Selangor

132kV TNB Line Three Towers Project

Electrical Completed

Design, build and prepare three towers (1 permanent 2 temporary) on 132kV TNB line

RM 1,300,000
MESC ENTERPRISE
Selangor

DUKE Section 1 - 275kV Transmission Line Relocation

Infrastructure Completed

Relocation of 275kV T/L at Jalan Khalsa for DUKE highway project

RM 7,498,726
WW ENGINEERING S/B
Kuala Lumpur

33kV Transmission Line PMU Santong to PMU AMBS

Electrical Completed

Design, build and prepare 33kV transmission line towers crossing East Coast Expressway

RM 336,000
TNB
Terengganu

Selangor Turf Club 33kV Transmission Line Relocation

Electrical Completed

Relocation of 33kV transmission line for proposed Selangor Turf Club development

RM 4,300,000
BERJAYACITY S/B
Selangor

Cyberjaya Development - 33kV Line Relocation

Electrical Completed

Relocation of TNB 33kV steel lattice mono-circuit towers and H Poles in Cyberjaya

RM 562,000
KTL S/B
Cyberjaya

Damansara Perdana 11kV Cable Rerouting

Electrical Completed

Proposed rerouting of existing 11kV TNB cables for road upgrading project

RM 409,940
MK LAND HOLDING BHD
Kuala Lumpur

275kV Kenyir - Tanah Merah Transmission Line

Electrical Completed

Construction and preparation of 2 units of 275kV transmission line towers

RM 720,000
TNB
Terengganu

132kV Double Circuit T-off Taiping - Kemunting

Electrical Completed

132kV double circuit T-off from existing transmission lines into Ibukota Ductile Iron Pipe Industry

RM 1,630,289
TNB
Perak

Electrified Double Track - TNB Overhead Relocation N6

Infrastructure Completed

TNB overhead relocation package N6 for Parit Buntar - Padang Rengas section

RM 1,379,985.01
MMC-GAMUDA
Perak

Electrified Double Track - TNB Overhead Relocation N7 to N8

Infrastructure Completed

TNB overhead transmission line crossing relocation package N7 to N8 (Padang Rengas - Ipoh)

RM 5,185,866.99
MMC-GAMUDA
Perak

Electrified Double Track - TNB Work Package N5 Sub-package 16

Infrastructure Completed

Utilities relocation of TNB work package N5 sub-packages 16 (Butterworth - Bukit Tengah)

RM 2,308,401.21
MMC-GAMUDA
Penang

Electrified Double Track - TNB Work Package N5 Sub-package 17

Infrastructure Completed

Utilities relocation of TNB work package N5 sub-packages 17 (Bukit Tengah - Bukit Mertajam)

RM 137,190.22
MMC-GAMUDA
Penang

Electrified Double Track - TNB Work Package N5 Sub-package 18

Infrastructure Completed

Utilities relocation of TNB work package N5 sub-packages 18 (Bukit Mertajam - Simpang Empat)

RM 4,320,645.89
MMC-GAMUDA
Penang

Electrified Double Track - TNB Work Package N5 Sub-package 19

Infrastructure Completed

Utilities relocation of TNB work package N5 sub-packages 19 (Simpang Empat - Nibong Tebal)

RM 542,209.82
MMC-GAMUDA
Penang

Electrified Double Track - TNB Work Package N5 Sub-package 20

Infrastructure Completed

Utilities relocation of TNB work package N5 sub-packages 20 (Nibong Tebal - Parit Buntar)

RM 841,552.86
MMC-GAMUDA
Penang

33kV Transmission Line Crossing River Project

Electrical Completed

Design, build and complete 33kV transmission line towers crossing river/flood areas

RM 775,480
TNB
Pahang

33kV Transmission Line Crossing KTMB Double Track

Electrical Completed

33kV transmission line crossing the proposed KTMB double track and existing KTMB track

RM 515,000
MMC GAMUDA
Perlis

Electrified Double Track - TNB Overhead Relocation

Infrastructure Completed

Relocation of overhead transmission line crossings for electrified double track project

RM 6,742,322.96
BALFOUR BEATTY S/B
Perlis

Jejambat Mahkota - TNB Transmission Pylon Relocation

Infrastructure Completed

Proposed construction of bridge connecting Jalan Mahkota, Taman Maluri, Kuala Lumpur

RM 1,760,000
ALAF MUDA S/B
Kuala Lumpur